PROJECT DETAILS

Aruna Roofing (Pvt) Ltd - Sedavatte

2025-06-30


  •         Fabrication, installation, and termination of one 1000A Main Distribution Board (MDB), three Sub-Panels, and three Distribution Boards (DBs).
  •         Incoming supply connection from the LECO panel to the MDB and distribution to other panels via cable trays.
  •         Complete lighting installation for the entire facility using high bay lamps and floodlights.
  •         Full office area electrical installation, including lighting and insulation.